Short answer: In Ottawa County, the “perc test” is called a Vacant Land Evaluation. The county’s Environmental Health Division uses it to make a preliminary call on whether a lot can support a private well and/or septic system for a new home. You apply and pay online through the county’s HealthSuite portal, mark where the house will go, and get a written result. A passing evaluation is not a permit. You still need well and septic permits, plus township permits, before you build.
I’m Daniel Dick. I own Highline Homes, a custom builder in Rockford, and I’m also a licensed real estate agent. Most of the homes we build go on land the client already owns, often outside the sewer lines. If your land is in Ottawa County, the process is different from Kent. Here’s how the Ottawa process works, in plain English.
What the Vacant Land Evaluation actually decides
Ottawa County describes it as “a program to preliminarily determine if a property is suitable for private home or semi public construction utilizing on site water wells and/or on site septic systems.” In practice it answers three questions before you spend money on plans:
- Can septic go here at all? Soil type and the seasonal water table decide that.
- What kind of system? A conventional system, or something engineered that costs more and takes more room.
- Where on the lot? The approved area can move the house, the driveway and the walkout.
If the lot will connect to public sewer and water, you may not need one. Ask the township first.
Kent vs. Ottawa: same idea, different process
| Kent County | Ottawa County | |
|---|---|---|
| What it’s called | Site evaluation | Vacant Land Evaluation |
| Who runs it | Kent County Health Dept, Environmental Health | Ottawa County Dept of Public Health, Environmental Health Division |
| How you apply | County application | Online at HealthSuite |
| Fees | On the current county application | On the county fee schedule (new fees took effect Oct 1, 2026) |
Building in Kent instead? See how the Kent County soil evaluation works.
Step by step in Ottawa County
- Check sewer and zoning with the township. If sewer is at the road, the septic question may go away. Zoning tells you setbacks and the building envelope.
- Gather the parcel facts. Parcel number, township, approximate address, owner of record, lot size or dimensions, and road frontage. The county also asks whether the parcel was split before or after April 1, 1997.
- Decide what you’re building. Single-family home, and whether you’ll use a private well or municipal water.
- Sketch the site. Show the street, where the house will go, landmarks, distances in feet and a north arrow. Attach a survey if you have one.
- Be ready to stake the house. Ottawa County’s rules let the health officer ask for a detailed plot plan, the legal description and staking of the building site. Flag the house corners early so it’s clear where the home will sit.
- Apply and pay online. Use HealthSuite. Check the current fee on the fee schedule, not a number from an old forum post.
- Get the result in writing and keep it with your lot file. Your builder and lender will want it. If the county needs more, such as excavations or soil borings, its rules say the applicant arranges and pays for them.
Three things that catch people
- It’s preliminary. A good result tells you the lot can likely work. It is not your well or septic permit.
- Budget for more than one fee. Fees are paid in full up front and, under the county’s rules, aren’t refunded once the department has started the work. The well and septic permits come later and are separate.
- “Not conventional” isn’t always “no.” A result that rules out a conventional system may point to an engineered system. Those can work, but they cost more and can dictate where the house sits.
How long a result stays valid: Ottawa County’s rules don’t set a fixed term. They say results are “for informational purposes only” and subject to later changes in the regulations, and they apply only to the site and plan you described. Septic permits, once issued, expire after 24 months. If your result is old or your plans changed, call Environmental Health before you rely on it.
Once the lot checks out, here is what it costs to build a custom home in Grand Rapids.
When to do it
If you’re still buying, make your offer contingent on the evaluation. If you already own the land, do it before you pay for final house plans, because the approved septic area can move the footprint. Our 12-point checklist for buying land and 9-point buildable lot check cover the rest.
Who to call in Ottawa County
| Question | Who |
|---|---|
| Vacant Land Evaluation, well and septic permits | Ottawa County Environmental Health, (616) 393-5645, eph@miottawa.org. Holland office: 12251 James St, Holland (Mon–Fri, 8–5). Grand Haven and Hudsonville offices by appointment. |
| Setbacks, zoning, building permits | Your township or city |
| Driveway onto a county road | Ottawa County Road Commission |
| Wetlands | Michigan EGLE |
| Boundaries and easements | A licensed surveyor and your title work |
Frequently asked questions
Does Ottawa County do perc tests?
Yes, under a different name. Ottawa County’s Environmental Health Division runs a Vacant Land Evaluation to preliminarily decide whether a lot can use a private well and/or septic system.
How do I apply for a vacant land evaluation in Ottawa County?
Apply and pay online through the county’s HealthSuite portal at miottawa.org/HealthSuite. Have the parcel number, township, lot size and a site sketch ready, and mark where the house will go.
How much does a vacant land evaluation cost in Ottawa County?
Check the county’s current Environmental Health fee schedule at miottawa.org/health/environmental/fees. Fees changed on October 1, 2026, so older numbers online may be wrong.
Is a vacant land evaluation the same as a septic permit?
No. It is a preliminary suitability decision. You still apply for well and septic permits, plus township building permits, before construction.
Can Highline Homes look at my Ottawa County lot?
Yes. Send the address or parcel number through our Free Lot Check. Daniel reviews it and sends back a one-page buildability snapshot.
Get your lot checked free
Own land in Ottawa or Kent County, or about to buy some? Start your Free Lot Check. You’ll get what fits, what to verify with the county, and an early budget range for building on it. Or call 616-297-0151. We also build in Hudsonville, Jenison and Grandville and Holland and Grand Haven.
About Highline Homes: Highline Homes LLC is a custom home builder founded in 2017 by Daniel Dick, based at 4457 Winding Trail NE, Rockford, Michigan (Michigan residential builder license 262200327, 616-297-0151). We build custom homes from about $400,000 to $3 million on clients’ own lots across greater Grand Rapids. 4.8 stars on Google. This page is general information, not legal, survey or engineering advice; Ottawa County and your township’s rules govern.
Sources: Ottawa County Environmental Health Regulations (effective Sept 1, 2016), Article XII Vacant Land Evaluations; Ottawa County well and septic page and Environmental Public Health fee schedule (effective Oct 1, 2026). Checked October 8, 2026.
Related: What drives the cost of a well and septic on a new build in West Michigan.